PUE 7, Chapters 2.4 and 2.5 Overhead lines — clause by clause

PUE 2.4 (LV OHL) and 2.5 (HV OHL): ABC conductors, ground clearances (6–7 m), tower earthing, lightning shield wires.

🇷🇺 PUE — Rules for Electrical Installations (7th ed.)🕰️ PUE-6 — Rules for Electrical Installations (6th ed., 1985)🇺🇸 NEC — National Electrical Code (NFPA 70)🇪🇺 IEC 60364 / HD 60364 (EU national codes)🌎 NOM-001-SEDE, NBR 5410, AEA 90364, RETIE, NCh 4, CNE🇨🇳 GB 50054, GB 50303, JGJ 16, GB/T 16895 (IEC 60364)🇮🇳 IS 732

Document

DocumentPUE 7, Chapters 2.4 and 2.5 Overhead lines
Edition2003 (ПУЭ-7, гл. 2.4 и 2.5)
StatusCurrent
Issued byMinistry of Energy of Russia
Applies toOverhead power lines: up to 1 kV (2.4) and above 1 kV (2.5)

Document structure

№Chapter / section
2.4.1–2.4.30LV OHL: general, conductors
2.4.55–2.4.70LV OHL: clearances
2.5.1–2.5.40HV OHL: general
2.5.76–2.5.90HV OHL: clearances
2.5.120–2.5.160Tower earthing, lightning
PUE 7, Section 1PUE 7, Section 7PUE 7, Chapter 2PUE 7, Chapter 3PUE 7, Section 1PUE 7, Section 1PUE 7, Section 1PUE 7, Chapter 1PUE 7, Section 6 LightingSP 256PUE 7, Section 1PUE 7, Section 1PUE 7, Chapter 2PUE 7, Chapter 4PUE 7, Chapter 7PUE 7, Chapter 7GOST R 50571 Building electrical installations (Russian IEC 60364)PUE 7, Chapter 2PUE 7, Chapter 7SP 158PUE 7, Chapters 2SP 76GOST R 50571Japan: electrical rules (JIS, 100 V)

LV OHL (2.4)

2.4.13 ABC (СИП) conductors recommended; 2.4.55 clearance ≥ 6 m over roads, 5 m elsewhere; 2.4.70 building intake ≥ 2.75 m.

HV OHL (2.5)

2.5.76 Clearance ≥ 7 m in populated areas (up to 20 kV); 2.5.129 tower earthing ≤ 10–30 Ω; lightning shield wires per calculation.

Design with GorkyCAD Pro

Automatic single-line diagrams, PUE/GOST/IEC calculations, specification and PDF — from one model.

Start free

Data is for reference. Final design decisions must follow current regulations and a qualified engineer.