PUE 2.4 (LV OHL) and 2.5 (HV OHL): ABC conductors, ground clearances (6–7 m), tower earthing, lightning shield wires.
| Document | PUE 7, Chapters 2.4 and 2.5 Overhead lines |
| Edition | 2003 (ПУЭ-7, гл. 2.4 и 2.5) |
| Status | Current |
| Issued by | Ministry of Energy of Russia |
| Applies to | Overhead power lines: up to 1 kV (2.4) and above 1 kV (2.5) |
| № | Chapter / section |
|---|---|
| 2.4.1–2.4.30 | LV OHL: general, conductors |
| 2.4.55–2.4.70 | LV OHL: clearances |
| 2.5.1–2.5.40 | HV OHL: general |
| 2.5.76–2.5.90 | HV OHL: clearances |
| 2.5.120–2.5.160 | Tower earthing, lightning |
2.4.13 ABC (СИП) conductors recommended; 2.4.55 clearance ≥ 6 m over roads, 5 m elsewhere; 2.4.70 building intake ≥ 2.75 m.
2.5.76 Clearance ≥ 7 m in populated areas (up to 20 kV); 2.5.129 tower earthing ≤ 10–30 Ω; lightning shield wires per calculation.
Automatic single-line diagrams, PUE/GOST/IEC calculations, specification and PDF — from one model.
Start freeData is for reference. Final design decisions must follow current regulations and a qualified engineer.