PUE chapter 1.8: acceptance tests, 0.5 MΩ insulation, earthing tests.
| Document | PUE 7, Chapter 1.8 Acceptance testing |
| Edition | 2003 (ПУЭ-7, гл. 1.8) |
| Status | Current |
| Issued by | Ministry of Energy of Russia |
| Applies to | Acceptance testing norms for electrical installations |
| № | Chapter / section |
|---|---|
| 1.8.1–1.8.3 | Scope |
| 1.8.13–1.8.16 | Cable line testing |
| 1.8.34–1.8.40 | Apparatus, earthing, wiring tests |
Continuity, phase rotation, insulation ≥ 0.5 MΩ (LV), HV withstand for >1 kV cables.
Breaker tripping, contact joints, PE continuity, earth resistance (≤ 4 Ω for TN dwellings).
Automatic single-line diagrams, PUE/GOST/IEC calculations, specification and PDF — from one model.
Start freeData is for reference. Final design decisions must follow current regulations and a qualified engineer.
← Back to the country: PUE Russia: Rules for Electrical Installations · World electrical installation rules