PUE section 1.1: terms (1.1.3–1.1.9), mandatory design (1.1.4), room classification by hazard (1.1.17).
| Document | PUE 7, Section 1.1 General part |
| Edition | 2002 (ПУЭ-7, разд. 1.1) |
| Status | Current |
| Issued by | Ministry of Energy of Russia |
| Applies to | General rules for electrical installations: terms, room classes, general requirements |
| № | Chapter / section |
|---|---|
| 1.1.1–1.1.9 | Scope, definitions |
| 1.1.10–1.1.16 | General requirements |
| 1.1.17–1.1.19 | Classification of rooms |
1.1.1 Applies to new and reconstructed installations up to 750 kV.
1.1.3 Electrical installation — machines, apparatus, lines and auxiliary equipment.
1.1.16 Equipment selected by environment: humidity, temperature, dust, chemicals.
Dry rooms (no increased hazard); rooms with increased hazard (damp, hot >35 °C, conductive floors, kitchens, basements); particularly hazardous (very damp ~100%, chemically active, bathrooms, garages, laundries).
Automatic single-line diagrams, PUE/GOST/IEC calculations, specification and PDF — from one model.
Start freeData is for reference. Final design decisions must follow current regulations and a qualified engineer.
← Back to the country: PUE Russia: Rules for Electrical Installations · World electrical installation rules