Electrical Switchboard for an Office Center

📊 Project Specifications

📐
340 м²
Area
🚪
12
Offices
🔌
85
Outlets
〰️
24
Circuits
2
Panels
⏱️
6 ч
Project Time

🎯 Task

Design the electrical supply for an office center with a server room, air conditioning, and workstations. Separation into power and IT networks was required.

💡 Solution

The designer used GorkyCAD to create two independent schematics. Voltage drop calculation showed the need to increase cable cross-section to the server room. Automatic RCD selection saved 2 hours.

Result

  • Main switchboard and floor panel schematic
  • Power outlet plan
  • IT outlet plan
  • Phase load calculation
  • Specification (BOM) — all in PDF