🏬 Commercial
Electrical Switchboard for an Office Center
📊 Project Specifications
📐
340 м²
Area
🚪
12
Offices
🔌
85
Outlets
〰️
24
Circuits
⚡
2
Panels
⏱️
6 ч
Project Time
🎯 Task
Design the electrical supply for an office center with a server room, air conditioning, and workstations. Separation into power and IT networks was required.
💡 Solution
The designer used GorkyCAD to create two independent schematics. Voltage drop calculation showed the need to increase cable cross-section to the server room. Automatic RCD selection saved 2 hours.
✅ Result
- • Main switchboard and floor panel schematic
- • Power outlet plan
- • IT outlet plan
- • Phase load calculation
- • Specification (BOM) — all in PDF