Commercial

Electrical Switchboard for an Office Center

📊 Project Specifications

📐
340 m²
Area
🚪
12
Offices
85
Outlets
〰️
24
Circuits
⚡
2
Panels
⏱️
6 h
Project Time

🎯 Task

Design the electrical supply for an office center with a server room, air conditioning, and workstations. Separation into power and IT networks was required.

💡 Solution

The designer used GorkyCAD to create two independent schematics. Voltage drop calculation showed the need to increase cable cross-section to the server room. Automatic RCD selection saved 2 hours.

✅ Result

  • • Main switchboard and floor panel schematic
  • • Power outlet plan
  • • IT outlet plan
  • • Phase load calculation
  • • Specification (BOM) — all in PDF

Frequently asked questions

Is this article free?
Yes, all articles and calculators are completely free.
Where can I run calculations?
The site offers 21 free calculators: cable sizing, breakers, RCD, voltage drop and more.
How do I prepare an electrical project?
In GorkyCAD Pro: plans, panels, calculations and a PDF set for free.
Found an error in the article?
Write to hello@gorkycad.pro — specialists will review and correct it.

Open free calculators →