--- Skip to content
🏡 Houses & Cottages

House & Cottage Electrical Design in GorkyCAD Pro

Design electrical systems for houses and cottages: 3-phase input, outdoor networks, grounding, main panel + sub-panels. Free start.

🚀 Try for free

Solutions for Houses & Cottages

Full design cycle: from service entrance to outlet.

3-Phase 400V Input

Full 3-phase input support. Automatic load balancing across phases, asymmetry calculation.

🏠

Main Panel + Sub-Panels

Panel hierarchy: main → distribution → floor → group. Automatic feeder topology and connectivity.

🌳

Outdoor Networks

Design of outdoor site lighting, service entrance cable, outbuildings, gates, pumps.

⛓️

Grounding System

Grounding grid calculation: electrode count, earth resistance, verification per IEC 60364-5-54.

🔌

High-Power Loads

Electric boiler, sauna, cooker, heat pumps, EV charger. Automatic cable sizing.

📄

Complete Documentation Set

Site plan, floor plan, single-line diagram, grounding schematic, cable schedule, estimate.

Interface: House with 3-Phase Input

Project: Residential 24kW — Floor Plan 📐 Floor Plan ⚡ Single-line 🔌 Panel DB-1 📊 3D View 🏠 🔌 💡 📏 🚪 🪟 Scale 1:50 Living Room 24.5 m² 💡 Kitchen 14.2 m² 3P Bedroom 16.1 m² 💡 Bathroom 5.8 m² Corridor Properties OUTLET GROUP Outlets.LivingRoom Cable: NYY-J 3×2.5 CALCULATION I = 10.4 A ✓ ΔU = 1.2% (<3%) L = 12.4 m Section selected: 2.5 mm² STATUS ✅ IEC check passed 5.0 m

Design Your Home Electrical System

Free. No installation. 3-phase input, grounding, outdoor networks — all covered.