How to design apartment electrical yourself — GorkyCAD Pro Blog
An apartment electrical project can be done yourself — no AutoCAD, no designer. Here is how to get a ready PDF set in one evening.
1. Wall and room plan
Start with the plan: draw walls, doors and windows in the editor. If you have a BTI plan — import DXF and trace walls over it.
2. Outlet and switch placement
Outlets at 300 mm, switches at 900 mm, lights on the ceiling. Just click on walls — objects snap automatically.
- Kitchen: 6–8 outlets + a dedicated stove line
- Bathroom: washing machine + boiler with RCD
- Bedroom: two-way switch + AC
3. Panel and groups
Auto panel assembly picks breakers, RCDs and busbars for your groups. Check and adjust ratings if needed.
- Lighting — 10A
- Outlets — 16A
- Stove — 32A
- RCD for wet zones — 30 mA
4. Calculations and checks
GorkyCAD Pro calculates load, cable cross-section and voltage drop per PUE. The norm check highlights errors before export.
5. PDF export
One click gives you the full set: layout plan, single-line diagram, specification and cable schedule — ready for approval.
FAQ
How long does an apartment project take?
A typical 1–3 room apartment — 2–4 hours, including checks and PDF export.
Do I need management company approval?
For a typical renovation a project for the electrician is enough; for re-planning check with the MC.
Does it comply with PUE?
Yes, calculations and checks are built in per PUE 7th edition and GOST.