Design 2025-06-08 · 8 min

Renovation Order — When Electrical Work Happens

Integrating pulse-output meters into your design. Connection diagrams, CT selection, AMR system based on GorkyCAD.

Author: GorkyCAD Team

Stage 1 — rough

Before plastering: chasing, cable laying, boxes, panel, grounding. Result: walls ready for plastering, wires in the boxes.

Stage 2 — finishing

After the finish: sockets, switches, lights, panel assembly, testing. Result: working electrical system.

When the panel is installed

Rough stage — the panel body with the input; the devices — at the finish, after the walls are clean.

What to do in advance

The project with the socket positions — BEFORE the chasing. Materials — per the specification, before the rough stage.

Typical mistakes

Chasing without a project — rework; plastered sockets at the wrong height; no project for the inspector — redone in a month.

Why a project first

The project fixes the sockets before the walls close. Changing a socket after the wallpaper is 100 times more expensive.