--- Skip to content
Design 2025-06-08 · 8 min

Grounding for a Private House — Complete Guide

Integrating pulse-output meters into your design. Connection diagrams, CT selection, AMR system based on GorkyCAD.

Author: GorkyCAD Team

TN-C-S or TT?

If the input line has PEN (4-wire) — make TN-C-S: split PEN into N and PE at the input, re-ground it. If re-grounding is not possible (bad soil) — TT with your own loop and RCD 300 mA.

Loop construction

3-6 vertical electrodes 2.5-3 m at a distance of 3 m, connected with a horizontal strip 4×40 mm. Depth of the top of the electrodes — 0.5 m below the surface.

Resistance norm

≤ 4 Ω for TN (per PUE) or ≤ 30 Ω for TT with RCD (per IEC 60364). Measure with a tester, not a multimeter.

Connection

The main ground bus (GZSh) in the panel, PE to it, N — separately through the meter. Never swap N and PE after the split.

Checks

Continuity of PE, resistance, RCD trip test. The protocol is part of the acceptance documentation.

GorkyCAD

Counts the loop: soil, electrodes, resistance check — the grounding drawing goes to the plan.

Frequently asked questions

Is this article free?
Yes, all articles and calculators are completely free.
Where can I run calculations?
The site offers 21 free calculators: cable sizing, breakers, RCD, voltage drop and more.
How do I prepare an electrical project?
In GorkyCAD Pro: plans, panels, calculations and a PDF set for free.
Found an error in the article?
Write to hello@gorkycad.pro — specialists will review and correct it.

Open free calculators →

Related tools

Open free calculators →