Comparison

TypeTimeCost
UPSMinutes-hoursFrom 5 000 ₽
GeneratorDays (fuel)From 30 000 ₽
Battery stationHours-daysFrom 100 000 ₽

For a house

Boiler + pump + fridge: UPS 1-3 kW or a battery station; long outages — generator with ATS. Gas generator — quiet and cheap fuel.

For an office

Server UPS — online 5-10 minutes to shut down; long — generator or battery. Critical loads on the UPS, the rest — on the generator.

Design

ATS, cable from the generator with the correct section, grounding of the generator, ventilation and noise. The switch is interlocks.

Solar + battery

A hybrid inverter with batteries covers short outages and reduces the bill — the most popular option now.

Why design

A wrong backup is a burned generator or a dead boiler in winter. The design counts the load and the time.