Electrical Project — What Stages It Has

Integrating pulse-output meters into your design. Connection diagrams, CT selection, AMR system based on GorkyCAD.

Author: GorkyCAD Team

Stage 1 — survey

Measurement of rooms, photos, panel inspection, plan import. The result: a basis for the design — the plan in CAD.

Stage 2 — concept

Zoning, socket and light positions, approximate loads, coordination with the client. The result: an agreement on the layout.

Stage 3 — working documentation

Schemes, panel, cable routes, specifications, estimate. The result: documents for installation and purchase.

Stage 4 — supervision

Installation by the project, checking deviations, test protocol, panel passport. The result: acceptance documents.

How to order

For an apartment — stages 1-3 in 1-2 days. For a house — add lightning protection and grounding; for industrial — the full chain with approvals.

How GorkyCAD helps

Generates the working documentation from the model automatically — the same set that a design office makes in weeks.