The set
- SLD per GOST 2.702;
- Floor plans with sockets, lights, routes;
- Equipment specification;
- Cable schedule;
- Estimate;
- Panel passport with QR;
- Test protocol (after installation).
Why needed
For approval (public buildings), for the electrician (installation), for the customer (acceptance and maintenance).
Formats
PDF with GOST title block, DXF for CAD, XLSX for the estimate. GorkyCAD generates everything from the model.