The set
- SLD per GOST 2.702;
- Floor plans with sockets, lights, routes;
- Equipment specification;
- Cable schedule;
- Estimate;
- Panel passport with QR;
- Test protocol (after installation).
Why needed
For approval (public buildings), for the electrician (installation), for the customer (acceptance and maintenance).
Formats
PDF with GOST title block, DXF for CAD, XLSX for the estimate. GorkyCAD generates everything from the model.
Frequently asked questions
Yes, all articles and calculators are completely free.
The site offers 21 free calculators: cable sizing, breakers, RCD, voltage drop and more.
In GorkyCAD Pro: plans, panels, calculations and a PDF set for free.
Write to hello@gorkycad.pro — specialists will review and correct it.