--- Skip to content

Accept electrical work like a professional

You don't need to be an electrician to accept the work correctly. Take the 15-point checklist: documents, devices per specification, RCD presence, grounding, cross-sections, panel, test report. 30 minutes — and the work is accepted correctly.

📐 Floor Plan & Rooms

🧱

Walls & Partitions

Load-bearing and non-load-bearing walls, partitions, thickness and material settings.

🚪

Doors & Windows

Door and window placement, size configuration, opening direction.

📏

Dimensions & Annotations

Automatic dimensions, callouts, text annotations on the plan.

📦

DXF Import

Import floor plans from AutoCAD and other CAD systems via DXF.

Electrical

Outlets & Switches

Power and low-current outlets, switches, dimmers. GOST/IS symbols.

💡

Lighting

Luminaires, lighting groups, automatic illuminance calculation.

📫

Junction Boxes

Automatic junction box placement, connection count accounting.

📋

GOST/PUE/IS Symbols

Complete library of symbols per GOST, PUE, IS, IEC standards.

🔲 Panels

🗄️

Auto Panel Assembly

Automatic panel layout: MCBs, RCDs, RCBOs, isolators — from the schematic.

📏

DIN Rails & Busbars

Automatic DIN rail length calculation, auto busbars per phase.

🌐

Feeder Topology

Panel hierarchy: main → sub → floor → apartment. Automatic connectivity.

〰️ Cables & Routes

🗺️

Auto Routing

Automatic cable routing via shortest path with obstacle avoidance.

📐

Cable Sizing

Automatic cross-section calculation by heating, voltage drop, short-circuit current.

📊

Cable Schedule

Automatic cable schedule generation with types, lengths, routes.

⬇️

Voltage Drop

Voltage drop calculation along the entire chain: from main panel to end consumer.

📊 Calculations

Loads

Pinst, Pcalc, Icalc, cos φ, Kd — automatic per IEC/IS standards.

🔥

Short-Circuit

Single-phase and three-phase short-circuit current calculation, breaker verification.

🔗

Selectivity

Protection selectivity check: upstream/downstream breaker coordination.

Deterministic Engine

All calculations are deterministic, not LLM. Guaranteed repeatability.

📄 Documents

📑

PDF Complete Set

Plan, single-line diagram, panel schematic, BOM, cable schedule, estimate — one click.

📐

DXF Export

Export plans and schematics to DXF for compatibility with AutoCAD and other CAD.

📊

Bill of Materials

Automatic bill of materials with equipment, cables and materials quantities.

💰

Estimate

Automatic cost calculation for equipment, cables, and installation work.

🤖 AI Assistant

Standards Checking

Automatic project check against GOST, PUE, IS, IEC with violation details.

💡

Recommendations

AI suggests fixes for errors and project optimizations.

Calculation Explanations

Step-by-step explanation of each calculation: formulas, inputs, results.

🔍

Project Search

Semantic project search: find all outlets in the bedroom, check cable size in the kitchen.

🏗️ 3D Visualization

3D Building Model

Automatic 3D building model from floor plan: walls, doors, windows.

3D Cable Routes

3D cable route visualization with color-coded groups.

🗄️

3D Panel

Three-dimensional panel visualization with DIN rails and devices.

And this is just the beginning. New features are added every week.

🌐 Open app 🚀 Try for free

The checklist (short)

  • Documents: contract, estimate, scheme, specifications;
  • Devices match the specification (brands, series);
  • RCD/RCBO on socket circuits — per scheme;
  • Grounding in every socket (3 wires);
  • Cable cross-sections match — inspect the shield;
  • Panel layout matches the scheme, free capacity;
  • Test report (insulation resistance, RCD trip);
  • Socket heights and locations match the plan.

If something doesn't match

Don't pay in full — list the mismatches in the act, set a deadline for fixing. Test results must be measured, not written by hand.

FAQ

Can I accept the work without a multimeter?
Yes — visually check the scheme, RCD labels, cross-sections in the shield; the test report is the electrician's responsibility.
What if there is no test report?
Do not accept the work: without measurements, you cannot prove faults later.