Case study · GorkyCAD Pro

Electrical project for a 300 m² office

A 40-seat café with a professional kitchen, refrigeration equipment and emergency lighting requirements.

📊 Project specifications

Type OfficeArea 300 m²
Workstations 60Phases Three-phase (380 V)
Calculated load 45 kWGroups 36
Lighting 500 lxDesign time 4 evenings

🎯 Task

Design lighting for 60 workstations with 500 lx per EN 12464, socket grid, server room with UPS, HVAC circuits and emergency lighting.

💡 Solution

Lumen-method lighting calculation, 12 lighting groups with scenes. Workstation socket grid on 4 circuits. Server room on a dedicated line with UPS and backup. Emergency lighting per exit routes.

✅ Result

Full PDF set for approval: SLD, lighting plan, socket plan, specification, cable schedule. LPD is within the norm — the office passes the energy audit.

FAQ

How much electrical work does a café need?

For a 100–150 m² café, typical calculated load is 30–40 kW with a three-phase supply.

Is emergency lighting required?

Yes, for food service venues emergency lighting is mandatory and designed on a separate line.

Can I design without experience?

Yes, GorkyCAD Pro calculates loads, cables and breakers automatically per regulations.