---

Case study · GorkyCAD Pro

Electrical project for a 200 m² cottage

Cottage with underfloor heating, electric boiler, garage and sauna — full load calculation and three-phase panel assembly.

📊 Project specifications

TypeCottage
Area200 m²
PhasesThree-phase (380 V)
Calculated load27 kW
Groups42
Design time1 evening

🎯 Task

The client needed a project accounting for underfloor heating, a 12 kW electric boiler, a garage group and a separate line for the sauna — fitting the budget and getting a ready PDF for approval.

💡 Solution

Outlet and lighting placement plan, cable sizing per PUE, panel assembly with RCDs and voltage relay, automatic cable schedule and specification.

✅ Result

The project is ready for approval and installation. The full PDF set — single-line diagram, layout plan, specification, cable schedule — is generated automatically.

FAQ

How much does a cottage project cost?

Design in GorkyCAD Pro is free — you pay only for the electrician's work under your agreement.

How fast can I make the project?

A typical 150–250 m² cottage takes one evening: plan, panel and PDF are generated automatically.

Does the project comply with PUE?

Yes, checks and calculations are built in per PUE 7th edition and GOST.

Create a project like this for free